Accuwright Mechanical
ROM Engine
Industrial install cost estimator
Accuwright ROM Engine

Machinery rigging cost estimator

Price the early planning range for heavy machinery rigging, lift equipment, millwright labor, cranes, trucks, mobilization, and difficult access.

Example rigging range
Verified engine example
$6,883 to $11,471
60,627 lb heaviest pick, crew of 4
Machines
3
Project days
1.0
Scope
Full Service
Site difficulty
Standard

Example uses the same live ROM Engine rates as the estimator: three 60,627 lb machines, full-service scope, and no travel distance. Site-specific quote requires confirmed route, weights, lift radius, floor condition, and schedule.

Rigging cost drivers

A useful rigging estimate has to model the work, not just multiply tons by a rate. ROM Engine starts with picks, crew, equipment class, duration, trucking, and mobilization.

Heaviest pick

The largest single component drives forklift, gantry, tandem, or crane requirements.

Access difficulty

Tight aisles, low doors, poor dock access, and overhead conflicts increase crew hours.

Equipment plan

Forklifts, boom lifts, gantries, cranes, rigging trucks, and support lifts all change the range.

Mobilization

Crew travel, service trucks, rental delivery, and add-on equipment freight matter before labor starts.

Drag-and-drop intake

Drop a spreadsheet, PDF, or photo into the estimator

ROM Engine is built for the way machine lists actually arrive: rough equipment schedules, emailed PDFs, photos of data plates, and half-clean spreadsheets. Drop the file, review the parsed machines, then price the scope.

Spreadsheet rows
PDF schedules
Image takeoffs
ROM Engine intake
Machine list
Haas VF-4 VMC11,720 lb
Mazak QTN 250MSY11,900 lb
Accurpress brake15,000 lb
ROM range
$5K - $9K
+/-25% planning estimate
Dropped file
press-install-list.pdf
Drop files anywhere
Parsed rows remain editable before pricing

Built for budget conversations

The estimator gives a planning range for early decision-making. It does not replace a field walk, engineered lift plan, or binding proposal, but it helps teams stop guessing before the quote package is ready.

Build your rigging estimate